The Guidance Center, Flagstaff, AZ
This project consists of mitigating a challenging building site and constructing a new 27,000-SF administration building. Site work involves importing approximately 20,000 CY of material to raise the existing site 6 feet above existing grade, drainage structures, underground utilities, curb, gutter, roadways and parking lots. The new 27,000-SF building will be two stories conventionally framed with a masonry veneer exterior. All areas will be fully air-conditioned with chilled water and hydronic heat. This project is being delivered by a Construction Management at Risk delivery method. Project budget is $5,000,000 and is expected to be completed with an 8-month period from ground breaking.